Electrical, Control and Instrumentation.
LeadEPC was contracted for a Turnkey Solution of a Pump-station as part of the 100MW Kaxu Solar 1 Project at Pofadder in the Northern Cape. Water was pumped from the Orange River to the CSP Plant. The Pump-station comprised of an intake Pump-station and a Booster Pump-station.
The work included a Fibre Optic link that connected the two Pump-stations to the DCS System in the Main Plant. The Control System was based on a Siemens Solution. The project included MCC, PLC and HMI, Instrumentation, Field Junction boxes, Site Lighting and Earthing.