Hulamin S6 Fire Damage Repair

LeadEPC > Projects > Hulamin S6 Fire Damage Repair

Repair work on a Cold Mill at Hulamin in Pietermaritzburg can be summarized as follows:

Scope of Work:

  • Remove all damaged cabling
  • Remove damaged cable support
  • Verify and revise documentation such as Load Lists, Cable Schedules and Termination Diagrams
  • Propose Material Lists
  • Site establishment with Safety File and Risk Assessment
  • Procure material
  • Install new equipment
  • QA / QC checks
  • Issue Certificate of Compliance for work

The project was completed within 10 days including Mobilization, QC and Commissioning.